What happened?
New Braunfels Utilities (NBU) responded to a sanitary sewer overflow early Wednesday morning after a storm system appeared to have caused a temporary power outage at the Rio Bar Screen Facility, located at 470 Rio Lane. The outage resulted in an unauthorized discharge of an estimated 550,000 gallons of wastewater into the Guadalupe River north of Lake Dunlap.
-
Why are lift stations and bar screens important?
-
What is a bar screen?
-
What is a lift station?
-
What improvements have been made since the storm response issues?
Since the incident, we have begun implementing additional measures to strengthen our systems and reduce the likelihood of a similar event. These actions include identifying critical facilities near environmentally sensitive areas and increasing testing of backup systems. We are also reviewing the planning, communication and approval processes surrounding maintenance activities at critical facilities, increasing testing and verification of backup…
-
How long will water quality monitoring continue?
-
What does “Planned maintenance” mean, and why couldn’t it be postponed?
Planned maintenance refers to planned work on infrastructure that is necessary to maintain system reliability, safety, and performance. In many cases, this work must be planned in advance based on contractor availability, system conditions, and operational requirements. In this instance, the maintenance had been planned prior to the storm event and was already underway when conditions changed.
-
Would response times have been faster if alarms had worked properly?
-
How was it discovered if the alarms didn’t work?
The issue was discovered when NBU crews were actively responding to widespread storm-related outages and checking infrastructure. While investigating those impacts, personnel identified that the lift station was without power and the overflow and immediately requested electric and wastewater crews for assistance.
-
Why didn’t the UPS/alarm system work as intended?
The UPS system is designed to support communication and alarm functions so that operators are immediately notified of a power loss. In this case, the alarm system did not function as intended, and the issue is being reviewed to determine the specific cause of the failure, including whether it was related to equipment performance, configuration, or storm-related impacts.